Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us



Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS

OPERATING


 

 

Control Board

HWH-BDC & SHE-TAK-Arambagh-Goghat

Naihati – BDC- SKG

BDC- KWAE- AZ

BZL- KANIncluding CC Link – BTNG

KAN – GMAN , NHT-AZ, RPH – Dumka

 

 

 

2.DETAILSOF JURISDICTION

Section

Length in KM

No. of tracks

No. of Block Stations

Signalling Arrangement

Howrah-Dankuni-Barddhaman-Khana (Electrified)

HWH-DKAE –14.81 kms

DKAE-CDAE – 25.41 kms

CDAE-SKG –42.66 kms

SKG-BWN –11.53 kms

BWN-KAN –13.15 kms

107.56

HWH-BEQ-BLY -5

BLY-DKAE-3

DKAE-SKG-3

SKG-KAN-4

 

21

HWH- CDAE = Automatic/ MACL

CDAE- BWN-KAN = Absolute /MACL

Howrah-Bandel-Barddhaman-Khana (Electrified)

HWH-SHE –22.15 kms

SHE-BDC –17.14 kms

BDC-SKG –55.91 kms

SKG-BWN –11.53 kms

BWN-KAN –13.15 kms

119.88

HWH-BEQ-5

BEQ-SRP-3

SRP-SHE-4

SHE-BDC-3

BDC-SKG-2

SKG-KAN-4

Bally –Palsit

21

HWH- BDC=Automatic/ MACL

BDC- BWN-KAN- Absolute / MACL

Sheoraphuli-Tarakeswar (ex SHE) (Electrified)

34.94

2

06

Absolute/MACL

Tarakeswar –Arambagh –

GoghatElectrified

(ex-TAK)

28.98

1

02

Absolute/MACL

One Train only system between Arambagh&Goghat)

Maynapur-Gokulnagar- Bishnupur( Electrified)

16.90

1

01

Absolute/MACL

One Train only system between (GNJP-Mayanapur)

KAN-SNT-RPH- PKR (Electrified)

PKR – GMAN-(Non Electrified)

KAN-JTL –4.20 kms

JTL-SNT –66.73 kms

SNT-RPH –27.81 kms

RPH-NHT –14.08 kms

NHT-GMAN –57.79 kms

170.61

2

GHLE – RPH

( 3 lines)

JTL - GMAN

27

Absolute/MACL

 

BDC-KWAE-AZ-AJLE

(Electrified up to Katwa)

BDC- KWAE –104.69 km (Doubling)

KWAE-AZ –72.74 kms

AZ-AJLE –2.47 kms

179.91

 

BDC-KWAE-2

KWAE-AZ-1

AZ-AJLE-2

BSAE-AZ-AJLE -29

(IBP- 06

KJU, SOAE,

BGRA,KLNT LKX,AGAE)

Absolute/MACLExcept AZ

(TALQ /Absolute)

 

Bandel-Naihati

(ex BDC &NH)(Electrified)

8.79

2

01

Absolute/MACL

Rajchandrapur-Dankuni (Electrified)

4.11

2

DKAE-CCL-3

01

Automatic/MACL

Bhattanagar –CC Link (Electrified)

3.70

2

01

Absolute/MACL

Azimganj – Nalhati ( Electrified excluding AJLE to AZ)

45.16

NHT-AZ -2

 

04

Absolute/MACL except AZ

(TALQ/Absolute)

Belur Store Yard – Belurmath

( Electrified)

1.485

1

01

One Train only/MACL

Magra – Tribeni

( Electrified / Goods Traffic only)

4.50

1

01

Absolute/MACL

Barddhaman – Katwa

(Electrified)

52.19

1

5

Absolute / MACL

Katwa – Ahamedpur

(Non Electrified)

53.02

1

04

Absolute/MACL

Khana Link-Jhapterdhal

(Electrified)

3.2

1

Unidirectional

--

Absolute/MACL

Rampurhat – Dumka

(Non Electrified)

 

64.50

1

02

Absolute/MACL

Liluah Goods Cabin – Tikiapara (SER) Electrified

2.275

2

----

Absolute / MACL

 

3.Stations

SUMMARY

 

Block Station

 

 

RRI

CP

CP with EI

EI

(VDU)

EP

IBP

Lever

Operated

Sub Total

1

Flag

Halt

Sub Total

2

Total

Station

06

77

19

07

10

06

03

128

-

-

-

Non Block Station

-

-

-

-

-

-

-

-

31

43

74

Total

 

202

 

4.L.C GATES:


 

5. COACHING MAINTENANCE DEPOTS:

 

Depot

No. of Lines

No. of rakes maintained

Deep Pit

Shallow Pit / Washable Apron / Kuchha

Receiving Lines

MYD Lines

Sick Lines

Stabling Line

Total

Primary

Secondary

Round Trip

Total

Tikiapara Coaching Complex

15

WA-3

---

---

4

14

36

20

---

7

27

Sorting Yard Coaching Complex

5+1

WA-3+1

2

3

5

---

18

11

---

9

20

Jheel Siding

1

SP-2

WA-3

Kuchha-3

---

---

2

9

20

7

---

2

09

BWN New Coaching Sdg.

3

---

---

---

---

1

4

4

---

4

8

AZ Coaching Sdg

 

 

 

 

 

 

 

2

---

2

4

 

6.LOADING POINTS:

Coal

Stone

Jute

Others

Janai Road

(Dankuni Coal Complex) - Coal Dust.

 

Pakur

Pakur Area

( PKR ,NGF TBB,KLP)

 

Rajgram

 

Pinargaria

Bally

 

Bhadreswar

Potato – Tarakeswar

 

Cement:- Talit, Janai from MUCL Siding.

 

Rice Bran, Food grain (FCI) – Barddhaman , Sainthia, Srerampur, Dankuni

 

 

 

 

 

       7. NUMBER OF PLATFORM AT DEPO STATION :

 

Howrah

Bandel

Barddhaman

Katwa

Rampurhat

Azimganj

22

7

8

8

4

6

      

8.   NUMBER OF TRAINS DEALT IN PAIRS (ORIGINATING/TERMINATING) 

DEPOT STATION

MAIL/EXPRESS TRAINS

PASSENGER TRAINS

EMUs

Howrah

116 (ER-62,SER-54)

11 (ER-7,SER-4)

245 (ER-169,SER-76)

Bandel

--------

------

71

Barddhaman

1

18

51

Katwa

------

9

17

Azimganj

2

19

------

Rampurhat

4

19

------

Bolpur

2

------

------

Dankuni

------

------

21

Others

------

------

76

EMU Terminating/Originating and others stations-

Berlur Math-6, Bally-1, Srirampur-6, Seoraphuli-13, Singur-3, Haripal-2, Tarakeswar-23,

Talpur-3, Pandua-2, Memary-5, Baruipara-4, Chandanpur-4, Masagram-4.Total-76.

 


      9.   PILGRIM CENTRES

              Belur Math

              Tarapith

              Tarakerswar

              Nabadwip dham

      10.   FOREIGN TOURIST CENTERS

              Bolpur – Santiniketan

              Nabadwip Dham – Mayapur

              Bandel – Bandel Church

      11.   THERMAL PLANTS SERVED

              Bandel Thermal Power Station

 

12.NUMBER OF OPERATING STAFF 

 

Category

Men on Roll

Controllers

41

Guards

680

Station Masters

1004

TNC s

111

Cabin Masters & Cabin Men

335

Gate Men

416

Porter

755

TOTAL

3342

 

 

13.   AVERAGE NUMBER OF GOODS TRAINS INTERCHANGED(DAILY)

 

Interchange Points

2017-18

 

Interchange Points

2017-18

M/O

T/O

 

M/O

T/O

Dankuni

7.1

4.2

 

Gumani

24.0

22.7

Belanagar

4.7

7.1

 

Tikiapara

3.9

4.7

Khana

21.1

19.4

 

Naihati

3.1

4.3

Bhattanagar

17.5

17.6

 

Jhapater Dhal

 

10.4

Sainthia

15.3

6.2

 

SBG Loop(Khana)

6.3

6.2

 

 

 

 

 

 

 

 

      14.   OPERATING PERFORMANCE FOR THE YEAR 2017 -18

Sl.No.

Item

Unit

Performance

 

1

Coal Loading

VU/Day

3.5

 

2

Other Goods Loading

VU/Day

267.9

 

3

Total Loading

VU/Day

271.4

 

4

Stone Loading

VU/Day

246.4

 

5

Coal Loading

M.T

0.093

 

6

Other Goods Loading

M.T

6.010

 

7

Total Revenue Loading

M.T

6.103

 

8

Stone Loading

M.T

5.565

 

9

Diesel Engine KM

Day/Eng

312.6

 

10

Diesel Engine Holding

 

38.6

 

11

Electric Engine KM

Day/Eng

260.9

 

12

Electric Engine Holding

 

34.1

 

13

Divisional Balance

 

4051.6

 

14

Wagon Turn Round

 

1.13

 

15

Total Interchange

 

9762.7

 

16

Divisional Release

 

300.6

 

17

Punctuality % ( M/Exp.)

%

75.3

 

18

Punctuality % ( Passenger)

%

83.5

 

19

Punctuality % (EMU)

%

91.5

 

 





Source : Eastern Railway CMS Team Last Reviewed on: 17-09-2018  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.